Inspecting the boundary

Inspecting the boundary

We begin by walking the boundary line, seeing the different conditions along it. Each side is different, The North of the site is water logged, and the existing trench that marks the boundary is overflowing with water. On some of the west side of the site there is a drop of 1.5m where the land has already been slipping. On the East side, along the road there is a large drainage ditch which is currently dry. There are several different conditions along the South side, some of it dry but in the middle the ‘river’ through the centre (North to South) of the site runs through it. Will our expected construction designs suit all these different conditions?

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s